Project Overview
390 Hudson Dr is a 28,000 sf distribution center with a 4,000 sf mechanic’s shop. The client group, Ideal Logistics approached Baribeau Construction to perform the complete design, permitting, and construction of this project. In partnership with Steelway Building Systems, we proposed a Progressive Design-Build delivery model which was accepted by the client.
This facility has been designed as a specialty distribution center specifically for the pharmaceutical industry. With 35' clear height and 100' clear span, this facility is design to maximize flexibility and efficiency. Underground fire water storage tanks were selected instead of fire ponds in order to maximize exterior truck storage.
Scope of Work
Industrial
Building Use
Distribution Centre
Size
28,000 square feet
Value
Completion Date
Winter 2024

Elias
project manager
From the Manager
What challenges have you been confronted with in this project?
"Doing a sprinkler system without a municipal water service at the road was a unique design challenge that took some creativity in engineering to overcome."
What's unique about this project?
"We are storing over 115,000 gal of water for fire protection underground on this site."
What details have you been intentional with that you think other construction companies would've just ignored?
"We dressed this building up a bit by doing architectural siding on the admin with a lot of glass and a parapet wall on the metal building to make it look like a flat, conventional roof."